Kanban

The Kanban method applied to software: visualising the flow, limiting work in progress, pulling work, spotting the bottleneck, measuring lead time, cycle time and throughput, reading a cumulative flow diagram.

  • 24 cards
  • 7 topics
  • Free

The outline, topic by topic

Each topic is weighted the way the exam weighs it.

  1. Concepts
  2. Questions
  3. Sort and link
  4. The numbers
  5. The curves
  6. Scenarios
  7. Understand

A few cards from the deck

  • Kanban: what is it?

    Show the answer

    A method that makes the flow of work visible on a board, limits work in progress and improves the way of working through small changes.

    It prescribes neither roles nor cycle length: you start from the existing process and evolve it, without replacing it in one go.

  • A request is made on day 1, waits in “To do” until day 4, work then starts and it is delivered on day 9. What are its lead time and cycle time?

    • Lead time 8 days, cycle time 5 days
    • Lead time 5 days, cycle time 8 days
    • Lead time 8 days, cycle time 3 days
    • Lead time 5 days, cycle time 3 days
    Show the answer

    Lead time 8 days, cycle time 5 days

    Lead time runs from request to delivery: 9 − 1 = 8 days. Cycle time runs from the start of work to delivery: 9 − 4 = 5 days. The 3 days of waiting are only in the lead time.

  • … is the number of items finished per unit of time, for example per day or per week.

    Show the answer

    Throughput is the number of items finished per unit of time, for example per day or per week.

    It counts only finished items: a nearly finished card does not count towards throughput.